Countertop Installation Timeline: Template to Install in 7 Business Days

The countertop installation timeline at Cornerstone runs from a quote within 2 business days, to slab selection at your pace, to template day, and then installation 7 business days after the template. Between template and installation, your slab is cut on our CNC in Charlotte. The dates that move most are the ones before template: choosing the slab and having cabinets and the sink ready.

Get new kitchen countertops in 7 business days

Slabs waiting in the Cornerstone slab yard before fabrication

Summary

  • Quote within 2 business days of your request.
  • Slab selection happens at your pace in our yard.
  • Installation is 7 business days after template day.
  • Delays usually come from cabinets, sink or decisions not ready at template.

The Timeline at a Glance

Here is how a typical countertop project moves from request to installation.

Countertop project timeline at Cornerstone
StageTimingWhat you do
QuoteWithin 2 business daysSend sizes or photos
Slab selectionAt your paceVisit the yard and approve your slab
TemplateDay 1Have cabinets, sink and faucet ready
FabricationBetween template and installBook your plumber's two visits
InstallationBy business day 7Clear the counters and the path

What Happens Inside the 7 Business Days

After template day, the template is used to lay out your pieces on the slab you chose. The slab is cut on our automated CNC with water, the edges are profiled and polished, and the sink opening is cut and finished.

Business days are Monday to Friday. A template on a Monday usually means installation by the following Tuesday; holidays move the date.

What Can Shift Your Installation Date

Most delays come from things that aren't ready on template day. Avoid them with this list:

  • Cabinets not installed or not level
  • Sink or cooktop not on site, so the cutout can't be confirmed
  • Edge, backsplash or seams still undecided
  • No access to the house on installation day

Our guide on how to prepare for countertop template and installation day turns this into a checklist.

Fitting Your Plumber Into the Timeline

Your plumber visits twice: before tear-out and after installation. We give you both dates once the template is scheduled. See our guide on do countertop installers do plumbing for details, and the installation process for every step. More in more countertop buying guides.

Frequently Asked Questions

How long does countertop installation take from start to finish?

Quote in 2 business days, then installation 7 business days after template. Slab choice depends on you.

Are the 7 days business days?

Yes, Monday to Friday, counted from template day.

Can installation be faster?

Yes. Our standard is up to 7 business days from template to installation, and the fastest is 3 business days, depending on the schedule and the stone.

What delays countertop installation most?

Cabinets not ready, a missing sink or decisions left open on template day.

Keep reading

Ready for a real number?

Get a Free Countertop Quote

Send your sizes or photos. Your written quote, with every line listed, is ready within 2 business days.