The Right Order: Who Works First in a Remodel
Stone and tile depend on what is installed before them. Getting the order wrong is the most common reason for a second trip.
Backsplash After the Countertop
The backsplash sits on the installed countertop, so we set the counter first and finish the wall after.
Shower Valves Before the Walls
Your plumber sets the valve and shower head before the walls go up. We don't do any plumbing.
Floors Before New Cabinets
In a full remodel, ask us whether the new floor should run under the cabinets before they are set.



