How we work · Charlotte, NC

Countertop Installation Process: From Template to Install in 7 Business Days

Countertop installation process: every countertop follows the same seven stages, with a date for each one and a payment tied to the work you can see. Here is exactly what happens, who does what, and what to prepare.

  • 2 business days to your quote
  • 7 business days template to install
  • 50% / 50% payment

Start with a free estimate

Your quote is ready within 2 business days.

The countertop installation process at Cornerstone Countertops & Cabinetry runs in seven stages: quote, slab selection, template, deposit, fabrication, installation and final payment. We send your written quote within 2 business days, then install 7 business days after the template visit. You pay 50% to start and 50% at completion, and we tell you in advance the two dates your plumber needs to be there.

Seven stages

The Seven Stages of Your Countertop Project

Each stage has a clear start and finish, so you always know what comes next and when.

  1. 1. Request Your Quote

    Send sizes or photos online or by phone. You get a written quote with every line listed.

    TimingWithin 2 business days

  2. 2. Select Your Slab

    Visit our yard at 7517 Orr Rd, no appointment, and choose the exact slab for your project.

    TimingAt your pace

  3. 3. Template Day

    We measure your cabinets on site with traditional templates and confirm seams, overhangs and the sink.

    TimingDay 1 of 7 business days

  4. 4. Down Payment

    The 50% down payment confirms the job before we cut your slab.

    You pay50%

  5. 5. Fabrication

    Your slab is cut on our automated CNC with water, and the edges and sink openings are polished. Natural stone such as granite needs a periodic sealant after installation; see how to seal granite countertops.

    WhereOur Charlotte shop

  6. 6. Installation Day

    Our crew removes the old top if it is on your estimate, sets the new countertop and the kitchen sink.

    TimingBy business day 7 after template

  7. 7. Walkthrough and Final Payment

    We check every seam and edge with you. The final 50% is due when the work is complete.

    You payFinal 50%

Who does what

Who Does What at Each Stage: You, Your Plumber and Our Team

Most delays come from a step nobody owned. This table shows every responsibility, including the plumbing we don't do.

Responsibilities at each stage of a countertop project
Stage You Your plumber Cornerstone
QuoteSend sizes or photosNot neededWritten quote within 2 business days
Slab selectionVisit the yard and approve the slabNot neededShow slabs, finishes and edges
TemplateCabinets final; sink and faucet on siteNot neededMeasure, plan seams and overhangs
Before tear-outEmpty the counters and sink baseDisconnect sink, faucet, disposal, dishwasherGive you the date in advance
InstallationClear path from door to kitchenNot on siteRemove old top if quoted; install stone and sink
After installationWalkthrough and final paymentReconnect water lines and appliancesWalkthrough and care instructions

Get Your Home Ready for Installation Day

Ten minutes of prep the evening before saves an hour on installation day.

Empty Everything

Counters, the sink base and the cabinets right under the old top.

Clear the Path

Slabs are heavy and long. Make room from the door to the kitchen.

Secure Pets

Doors stay open while we carry stone. Keep pets in a closed room.

Confirm the Plumber

Make sure the disconnect happened and the reconnect is booked.

You know the price before template day: countertops start at $29.95 per sq ft installed, paid 50% to start and 50% at completion, never in full upfront.

Start My Free Estimate
Close-up of a newly installed white quartz countertop with soft gray veins

Behind the process

The Team Behind Every Stage

The same family-owned company handles every stage, from the quote to the walkthrough, with no subcontracted fabrication. Every job carries our 1-year warranty on fabrication and installation, and we are fully insured for every service we provide.

Learn more about Cornerstone, read what homeowners say about working with us, or find quick answers in our FAQ.

FAQ

Process Questions

Short answers about timing, payments and installation day.

How long does countertop installation take?

We install within 7 business days of template, and as fast as 3 business days when the schedule and stone allow.

What happens on template day?

We measure your cabinets on site, confirm the sink and faucet, and plan seams and overhangs with you.

When do I pay?

50% after template to confirm the job, and the remaining 50% when installation is complete.

Do I need to be home on installation day?

It isn't required, but we recommend it. Being home lets you check the seams, edges and sink placement with the crew before they leave.

When can I use my new countertop?

Your plumber can reconnect the sink 24 hours after the installation time. Once the plumbing is reconnected, the sink and counters are ready to use.

Do you handle the plumbing?

No. Your plumber disconnects before tear-out and reconnects after installation. We give you both dates in advance.

Free estimate

Start With a Free Estimate

The first stage takes two minutes: tell us about your project and get a free estimate. Your quote is ready within 2 business days.